CONSTRUCTION OF PRE-FABRICATED BUILDINGS FROM LIGHT METAL STRUCTURES (LMS, LSTWS) AND MODULAR OF CONTAINER-TYPE

 
Quality control system is certified
        EN ISO 9001 : 2000!

 
 

   
   
Moscow + 7 (499) 753-32-07
Minsk +375 (17) 203-24-25

E-mail

Our successful projects:


Photogallery

Construction of pre-fabricated buildings and facilities from Astron light steel structures
Warehouses, storage and logistics buildings and facilities
Administration and office buildings
Shopping centers and malls
Logistics buildings and facilities
Sports buildings and constructions
Car dealerships and service stations
Multilevel parkings
Multistory buildings, hotels
Aviation buildings and facilities
Industrial warehouses and facilities
 

Projects of MVK-Stroy Construction Company
Pre-fabricated buildings from light steel structures Astron

Prices, cost of facilities and buildings construction

Below is given a short list of the facilities constructed by MVK-Stroy Construction Company. During the years of our company operation we constructed buildings and facilities for different applications and for wide range of industries: production sector, trade, transport and communications, housing and public utilities, and agricultural sector. Geography of pre-fabricated buildings from light metal structures developed by our company covers not only Moscow and Moscow Region but almost all regions of Russia: North-west, Ural, Siberia, South, regions of Far North and Far East.

АО Biryulevo, 1a Stupinskiy Proezd, Moscow Building: Foodstuff primary processing plant. Project stage: Finished. Building type: two-floors building, AZM1 (single-span production building), frame interval 9–9.25 m, 25х37, 160 m (929 m2), cresting height 9.6 m, mezzanine at the elevation 6.1 m (929 m2), roofing panels – PR, wall panels – PA.
TSKA tennis courts, Moscow Project stage: Installation. Building type: A single-floor sports building, AZM1 (single-span), frame interval 9.00 m, 36 х 72 m (2,592 m2), eaves height 5.5 m, roofing panels – PR, wall panels – PA, interior wall covering – PI.

Drive Electro LLC, Krasnaya Pakhra, Troitsk, Moscow Region Building: production building. Project stage: Construction is finished. Building type: two-floors building, AZM1 (single-span), frame interval 8.00 m, 36 х 56 m (2,016 m2), eaves height 6.4 m, mezzanine at the elevation 3.4 m (301 m2), roofing panels – PR, wall panels – PA, interior wall covering – PI.

Drive Electro LLC, Krasnaya Pakhra, Troitsk, Moscow Region Building: administration and on-site facility. Project stage: Construction is finished. Building type: AZM1 (single-span), frame interval 8.00 m, 24 х 24 m (576 m2), eaves height 6.4 m, mezzanine at the elevation 3.4 m (576 m2), roofing panels – PR, wall panels – PA.
ОАО Borets, 6 Skladochnaya Ulitsa, Moscow
Building: machine-assembly workshop and finished goods warehouse.
Project stage: Construction is finished.
ATP 19 Building, Tomilino, Moscow Region
Building: Service station for large trucks. Project stage: construction is finished. Building type: two-floors garage-type building, AZM2 (double-span), frame interval 10.875 m, 30 х 43 m (1,290 m2), eaves height  7.5 m, mezzanine at the elevation 4.4 m (187.5 m2), roofing panels – DSR, wall panels – PA, interior wall covering – PI.
Logistics terminal building, Vologda Poultry Farming Center
Project stage: Construction is finished. A single-floor storage building, AZM2 (double-span), frame interval 7.273 m, 40 х 80 m (3,200 m2), eaves height 4.8 m, roofing panels – PR, wall panels – PA, interior wall covering – PI.

Click HERE to see construction stages of logistics center building. 35,000 m2 during 5.5 months!